Standard heights are 4.2m, 5.2m or 6.2m to the eaves with the width and length in 5 metre spans.
Chilled buildings are significantly faster to complete than conventional build projects. The lead time from order to starting on site is around six weeks, with completion in a further four weeks.
Our permanent and temporary buildings can be installed on concrete surfaces using anchor bolts. If your site has a different surface, our team will assess your ground and take care of any necessary work needed before installation.